At the end of the year 2020, we’ve successfully packed up the entire store, while contractors have taken down our awning, removed our old windows, removed our second door entrance, and demolished the entire store interior. They’ve also reinforced the building sil, rebuilt the Bow Street exterior wall and the shop interior ceiling, built a new sub-floor, reframed the windows, and installed new windows. We look forward to bringing you more updates as we have them in 2021 here and video updates here!